Stemming Plugs Improve Blasting, Productivity

Product Details
Customization: Available
After-sales Service: Online Service
Function 1: Improvement in Fragmentation
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
Low MOQ
The MOQ for the supplier's products is 1
to see all verified strength labels (10)
  • Stemming Plugs Improve Blasting, Productivity
  • Stemming Plugs Improve Blasting, Productivity
  • Stemming Plugs Improve Blasting, Productivity
  • Stemming Plugs Improve Blasting, Productivity
  • Stemming Plugs Improve Blasting, Productivity
  • Stemming Plugs Improve Blasting, Productivity
Find Similar Products
  • Overview
  • Product Description
  • APPLICATION
  • FAQ
Overview

Basic Info.

Model NO.
PS002
Function 3
Reduction of Noise and Airblast
Function 4
Downstream Productivity Gains
Function 5
Significant Cost Saving
Transport Package
Standard Export Packing
Specification
46-55 or customization
Trademark
KUANGBAO
Origin
China
HS Code
8207199000
Production Capacity
1000PCS/Month

Product Description

Product Description
Typically, the loss of explosive energy through stemming ejection reduces the performance of the blast. The fundamental theory promoting the use of stemming enhancement plugs is that they could potentially improve the effectiveness of stemming material in the blast hole. This would, in turn, better contain the explosives energy within the rock mass, and yield a more controlled and efficient blast event.

The three keys to efficient blasting are:
1. Energy level ? the amount of available energy in the explosive product
2. Energy distribution ? the optimised linear distribution of the explosives
3. Energy confinement ? the optimised burden to energy ratio

The optimum stemming column height is determined so it provides proper energy confinement while still allowing for maximum explosive energy distribution.

The measure of the potential effectiveness that the available explosives energy has to break and displace the rock mass is directly proportional to the effective burden that energy must overcome. This relationship is a crucial element in basic blast design. An accurate controlled sequence of hole detonation is a fundamental design parameter, having a major direct effect on overall blast performance. Any variation in hole detonation timing, results in that hole being fired prior to or after its nominal firing time. The hole-to-hole detonation could still remain properly sequenced or holes could potentially detonate totally out of sequence. This will result in burden to energy relationships that can have adverse impacts on the performance of a blast.


The results of these impacts have been witnessed in the past as:
1 Poor rock fragmentation
2 Large amounts of oversize
3 High ground vibration levels
5 Flyrock incidents
6 High downstream processing costs

Stemming Plugs Improve Blasting, ProductivityPlugs work by creating a blocking effect within the drill hole by wedging the stemming material between the drill hole wall and our plug. Upon detonation of the explosives, the plug is forced upward into the stemming material and "locks up". The explosive gases and energy are prevented from traveling (venting) up through the drill hole, and instead are contained within the rock mass for milliseconds longer than non-plugged blasts!

Plugs work by creating a blocking effect within the drill hole by wedging the stemming material between the drill hole wall and our plug. Upon detonation of the explosives, the plug is forced upward into the stemming material and "locks up". The explosive gases and energy are prevented from traveling (venting) up through the drill hole, and instead are contained within the rock mass for milliseconds longer than non-plugged blasts!

Increased Fragmentation, Fracturing and Cap Rock Breakage. Reductions in Fly Rock, Air Blast, Stemming Ejection, Dust, Noise and Oversized Rock. These are all direct benefits and results of containing the blast energy within the rock mass for milliseconds longer than normal, simply by using.
Stemming Plugs Improve Blasting, ProductivityStemming Plugs Improve Blasting, ProductivityStemming Plugs Improve Blasting, ProductivityStemming Plugs Improve Blasting, Productivity
APPLICATION

Stemming Plugs Improve Blasting, Productivity

FAQ

The information you may like to know before order:

1. Methods of Payment:

  T/T (Telegraphic Transfer) or Western Union or L/C at sight

2. Handling time for an order

  Based on order quantity, normally it takes 25 days for production.

  Only 2 or 3 days if we have stock on your request size.

3. Shipping way

  Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air

  Bulk order: we suggest by air or by sea.

4. Quality Control

  We have our own experienced QC.

  There will be strict inspection and testing for every order before shipping out.

5. After Services:

  a. Our sales team will response for your question within 24 hours (Holidays Excluded)

  b. Technical Support will be available in any time

  c. Free replacement will provide once the failure confirmed caused by our product quality

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier