• Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm
  • Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm
  • Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm
  • Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm
  • Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm
  • Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm

Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm

After-sales Service: Online Service
Function 1: Improvement in Fragmentation
Function 2: Reduction of Flyrock
Function 3: Reduction of Noise and Airblast
Function 4: Downstream Productivity Gains
Function 5: Significant Cost Saving
Customization:
Gold Member Since 2024

Suppliers with verified business licenses

Fujian, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
Low MOQ
The MOQ for the supplier's products is 1
to see all verified strength labels (9)
  • Overview
  • Product Description
  • APPLICATION
  • FAQ
Overview

Basic Info.

Model NO.
PS001
Transport Package
Standard Export Packing
Specification
46-55 or customization
Trademark
KUANGBAO
Origin
China
HS Code
8207199000
Production Capacity
1000PCS/Month

Product Description

Product Description
Can they improve blasting and productivity?
 

Of the various products introduced to improve blast performance, flyrock control and productivity, stemming plugs have been looked upon with some disbelief and uncertainty.

Typically, the loss of explosive energy through stemming ejection reduces the performance of the blast. The fundamental theory promoting the use of blast-improvement and containment plugs is that they could improve the effectiveness of stemming material in the blasthole. As a result, this would better contain the explosives energy within the rock mass and yield a more controlled and efficient blast.

The three keys to efficient blasting are:
1.Energy level - the amount of available energy in the explosive product.
2.Energy distribution - the optimized linear distribution of the explosives in the rock mass.
3.Energy confinement - the optimized burden to energy ratio.
The optimum stemming column height is determined to provide proper energy confinement while still allowing for maximum explosive energy distribution in the blasthole. The measure of the effectiveness of the available explosive energy to both break and displace the rock mass is proportional to the effective burden that energy must overcome. This relationship is a crucial element in basic blast design.

stemming plug for mining, quarrying, and civil blasting applications

 is a stemming plug for mining, quarrying, and civil blasting applications. The stemming plugs increase energy retention and utilization during blasting, resulting in a range of benefits:
Improvement in Fragmentation
Reduction of Flyrock
Reduction of Noise and Airblast
Downstream Productivity Gains
Significant Cost Saving
is available for all blasthole diameters ranging between 1.75 inches (45mm) to 2.17 inches (55mm).
Stemming plugs are a valuable tool. It pays to be open-minded and to evaluate new technologies.
Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mmManufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mmManufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mmManufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mmManufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mmManufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm
APPLICATION

Manufacturer of Blasting/Stemming Plugs, Stemming Plug for Hole Diameter: 46mm/55mm

FAQ

The information you may like to know before order:

1. Methods of Payment:

  T/T (Telegraphic Transfer) or Western Union or L/C at sight

2. Handling time for an order

  Based on order quantity, normally it takes 25 days for production.

  Only 2 or 3 days if we have stock on your request size.

3. Shipping way

  Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air

  Bulk order: we suggest by air or by sea.

4. Quality Control

  We have our own experienced QC.

  There will be strict inspection and testing for every order before shipping out.

5. After Services:

  a. Our sales team will response for your question within 24 hours (Holidays Excluded)

  b. Technical Support will be available in any time

  c. Free replacement will provide once the failure confirmed caused by our product quality

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now