Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs

Product Details
Customization: Available
After-sales Service: Online Service
Function 1: Improvement in Fragmentation
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
Low MOQ
The MOQ for the supplier's products is 1
to see all verified strength labels (10)
  • Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs
  • Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs
  • Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs
  • Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs
  • Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs
  • Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs
Find Similar Products
  • Overview
  • Product Description
  • FAQ
Overview

Basic Info.

Model NO.
stemming plugs
Function 2
Reduction of Flyrock
Function 3
Reduction of Noise and Airblast
Function 4
Downstream Productivity Gains
Function 5
Significant Cost Saving
Transport Package
Standard Export Packing
Specification
46-55 or customization
Trademark
KUANGBAO
Origin
China
HS Code
8207199000
Production Capacity
1000PCS/Month

Product Description

Product Description
Overview and features
Plastic stemming plugs are used to retain explosive energy in blast holes drilled underground.
In operation the explosive energy wedges the stemming plug into the surrounding hole. This redirects the energy of the blast into the blast hole wall, which effectively contains the explosive energy.
 
Benefits
Good stemming practices, with controlled energy retention prevents cratering and results in less damage to the brow of the stope.
Effective stemming contains explosive gases increasing the energy imparted to the rock mass as well as improves fragmentation of the blast rock.
It greatly reduces airblast and the damage caused as a result of airblast.
Simple and easy to use and can be incorporated into charging procedures for underground blast holes.
Ready for immediate use and is stored with ease underground.
 
Operating Instructions
The stemming is ready for insertion into the hole.
Clip the IED lead wires or Shocktube into the gate in the cap.
Place the closed end of the stemming into the blast hole and push it until the cap fingers engage the blast hole wall.
Pull back on the IED leads or Shocktube to ensure it is free and has not become tangeld.
While holding the lead wires or Shocktube push the stemming into the desired position in the blast hole.

 is a stemming plug for mining, quarrying, and civil blasting applications. The stemming plugs increase energy retention and utilization during blasting, resulting in a range of benefits:
Improvement in Fragmentation
Reduction of Flyrock
Reduction of Noise and Airblast
Downstream Productivity Gains
Significant Cost Saving
is available for all blasthole diameters ranging between 1.75 inches (45mm) to 2.17 inches (55mm).
Stemming plugs are a valuable tool. It pays to be open-minded and to evaluate new technologies.
Offer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming PlugsOffer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming PlugsOffer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming PlugsOffer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming PlugsOffer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming PlugsOffer Improved Blast Performance, Fly Rock Control Savings in Secondary Breakage & Downstream Costs Blasting Plugs Stemming Plugs

 

FAQ

The information you may like to know before order:

1. Methods of Payment:

  T/T (Telegraphic Transfer) or Western Union or L/C at sight

2. Handling time for an order

  Based on order quantity, normally it takes 25 days for production.

  Only 2 or 3 days if we have stock on your request size.

3. Shipping way

  Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air

  Bulk order: we suggest by air or by sea.

4. Quality Control

  We have our own experienced QC.

  There will be strict inspection and testing for every order before shipping out.

5. After Services:

  a. Our sales team will response for your question within 24 hours (Holidays Excluded)

  b. Technical Support will be available in any time

  c. Free replacement will provide once the failure confirmed caused by our product quality

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier